June 20, 2019

Monday, June 10th:

The team visited the future site of the Melka Olba School as it will be relocated this fall.  The team visited with the builders laying foundations and also tested the area for clay content in hopes to build a retention pond to collect water.  Back at the borehole, the team finished the assembly of the system.  We produced water!!!!